Conversion and change of use: structural design for change of use, added storeys, new openings and new circulation in an existing building.

When offices become flats, a department store becomes a data centre, or four storeys become six.

Typical tasks

  • Change of use with higher imposed loads
  • Added storeys, in lightweight construction where the foundations will take no more
  • Openings in walls and slabs, with transfer structures
  • New stair cores, lifts and risers
  • Stability, where loadbearing walls are removed

What to settle first

Not the layout – the foundations. They decide how much additional load the building can take at all, and therefore whether adding storeys is realistic.