HVAC

Heating, ventilation and air conditioning design: heat and cooling generation, distribution, ventilation strategy and verification under the GEG.

From generation through to the room.

Scope

  • Heating and cooling load calculations
  • Heat and cooling generation, including heat pumps and district heating connections
  • Distribution networks, routing and riser allocation
  • Ventilation strategy with heat recovery
  • Verification under the German Buildings Energy Act (GEG)

The dependency that surfaces late

The plant follows from the envelope. If the insulation changes during design, the heating load changes – and with it, possibly, the whole generation strategy. That is why we calculate building physics and services together.