Schedule Control
Programme control: programming, progress monitoring, delay analysis and recovery measures across design and construction.
Programmes that are actually updated – and that show what a late activity really costs.
Services
- Framework, outline and detailed programming
- Progress monitoring against the planned sequence
- Analysis of disruption and its effect on the critical path
- Recovery and acceleration measures, with the cost consequence quantified
The critical path runs through the design
Delay usually starts before site: an outstanding approval, a missing detailed design, a late decision. A programme that only begins at construction start sees it too late.