Execution Design
Detailed design for site: formwork and reinforcement drawings, steel and timber shop drawings, and shop and erection drawings for precast.
The drawings the building actually gets built from. This is where it is decided whether the design works on site – or whether the foreman calls.
Hitting dates is the real service
Detailed design is almost always needed under time pressure, often section by section and in parallel with a structure already going up. We design in the order you pour, not in the order of member numbers.
That applies to design changes too: when something changes mid-construction, you get the revised drawing set, not a discussion about the change.
Three kinds of drawings
Depending on the method of construction we produce formwork and reinforcement drawings for concrete, shop drawings for steel and timber, or shop and erection drawings for precast.