Formwork & Reinforcement Drawings
Formwork and reinforcement drawings to Eurocode 2, with bar and bending schedules, delivered section by section to match the pour sequence on site.
Formwork drawings, reinforcement drawings, bar and bending schedules – the set the concrete frame is built from.
What we deliver
- Formwork drawings with all cast-in items, recesses and openings
- Reinforcement drawings to Eurocode 2, drawn so the steel can be fixed
- Bar and bending schedules as the basis for ordering
- Coordination with the formwork designer and work planning
“Drawn so the steel can be fixed” means
That the reinforcement is drawn the way it can actually be installed: laps traceable, cover maintained, corners and junctions resolved on the drawing rather than left to the steel fixer. That saves more time on site than it costs in the office.
Section by section
On larger projects we design to the pour sequence. You get the next section before the previous one is finished – rather than the complete set too late.