Construction Companies
Detailed design and analysis for contractors: formwork and reinforcement drawings in pour sequence, construction stages, temporary works and value engineering.
You build. We provide the information that makes that possible – in the order you need it.
What you need from us
- Formwork and reinforcement drawings by pour sequence, not as one package too late
- Verification for construction stages, formwork, falsework and erection
- Temporary works and excavation design
- Someone reachable when a question comes up on site
How we work
A drawing set that arrives two weeks late is worthless to you, however good it is. We design against your construction programme and issue phase by phase. If a date is going to slip, we say so beforehand.
Reinforcement is drawn so it can be fixed: laps traceable, cover maintained, corners and junctions resolved rather than left to the steel fixer – see formwork and reinforcement drawings.
Value engineering
Where someone else’s design builds more expensively than it needs to, we calculate the alternative – different slab depth, different reinforcement strategy, precast instead of in-situ – as the basis for an alternative tender or a value engineering proposal. With quantities, so you can price it.