Construction Companies

Detailed design and analysis for contractors: formwork and reinforcement drawings in pour sequence, construction stages, temporary works and value engineering.

You build. We provide the information that makes that possible – in the order you need it.

What you need from us

  • Formwork and reinforcement drawings by pour sequence, not as one package too late
  • Verification for construction stages, formwork, falsework and erection
  • Temporary works and excavation design
  • Someone reachable when a question comes up on site

How we work

A drawing set that arrives two weeks late is worthless to you, however good it is. We design against your construction programme and issue phase by phase. If a date is going to slip, we say so beforehand.

Reinforcement is drawn so it can be fixed: laps traceable, cover maintained, corners and junctions resolved rather than left to the steel fixer – see formwork and reinforcement drawings.

Value engineering

Where someone else’s design builds more expensively than it needs to, we calculate the alternative – different slab depth, different reinforcement strategy, precast instead of in-situ – as the basis for an alternative tender or a value engineering proposal. With quantities, so you can price it.